<aside>
đź’ˇ
Semester Mission & Goals:
Finish all final edits and changes to the web side of the system and begin working on revamping the mobile. Begin a soft launch “campaign” to the public.
What does this look like:
- Final approval of features from SDS
- Web hand-off to SSIT/CIT
- Devs get access to IOS accounts for mobile development
</aside>
Web Features:
- Redesigning the web analytics page (currently outdated, with no documentation)
- Add admin page for scheduled and unscheduled rides
Mobile Application:
- Need access to IOS dev accounts
- Will have to do a IOS/Android tech-stack analysis revamp
- TBD
Design Needs:
- Redesign for the current web analytics page
- Design iterations for admin home page (for unscheduled and scheduled rides)
- Mobile - TBD (need access to dev accounts)
- Design workspace for Materials UI
Timeline:
- Sprint 1 [2/6 - 2/20]
- Sprint 2 [2/21 - 3/6]
- Sprint 3 [3/7 - 3/20]